Frequently Asked Questions
What equipment is required for fitting corrugated side wall?
By means of hot air or infrared heating: VEE 1700
- Side wall up to 100 mm high
- Side wall on a foot: + SWSF and SWUN option
- Side wall without a foot: + SWUN option
With infrared heating: + IRUN option
- By means of RF (radio frequency) heating: HFP or HFO + fitting mould
- Side wall up to 100 mm high
- Side wall on a foot: + tailormade fitting mould